Another project comes to an end
So anyhow, today was the day that began the move back into our bedroom. A little background however may be in order. You see we once had this little Master Bathroom off the bedroom that was well, disgusting and not one I was about to call mine since it was all Pink! The idea was simple, gut it and rebuild it. That was what we thought. The original design from the contractor also confirmed our biggest fear. We would not be able to squeeze any more room from the space. That was quite disappointing so we decided to move ahead with it anyhow. That was when things in that bathroom began to get very ugly. During the gutting process, it was discovered that there was a leak under the tub that happened to be rotting out the one of the beams supporting the bathroom. That meant going into the family room on the 1st floor and completely ripping out the ceiling and replacing the beams that were bad. With that decision the course had been shifted and the serious deconstruction work began. There have not really been any more major issues with the Job and now that the bulk of it is done, we officially begin moving back in today. Here are some of the snapshots of the latest project to turn 2 bedrooms, 2 bathrooms into an amazing Master Bedroom Suite. These are the revised Floor Plan Drawings indicating the new Bathroom design. Only one minor change which was the flip of the Tub and the Sinks.